BASIS

Due to the investments made, Pa&Co International disposes of facilities at the highest technological level, which serve to cover a wide range of civil and industrial engineering works, infrastructure and superstructure. Concrete and asphalt plants from Tartasesti, Medgidia, Bacau, Onesti have higher productivity and ensure a minimum level of emissions.

 
At the production base from Tartasesti, county of Dambovita, functions a concrete plant of BETOMIX production, with a capacity of 100m3/hour and an asphalt mixing plant, with a capacity of 240 tones/hour.
 
At the production base from Medgidia is an asphalt mixing plant, with a capacity of 200 tones/hour.
 
At the production base from Bacau functions an asphalt mixing plant, with a capacity of 160 tones/hour.
 
At the production base from Onesti is an asphalt mixing plant, with a capacity of 90 tones/hour.
 
At Onesti is also an asphalt emulsions plant, of 15 tones per hour bitumen emulsion.
 
All plants are fully automated and can prepare all types of asphalt mixtures used in Romania or on the EU market. Stations can be removed and, within ten days, can work on a new site.
Locality Coordonates
Tihau 47º14' lat. N 23º19'long E
Tg. Neamt 47º12' lat. N 26º22'long E
Gheorgheni 46º43' lat. N 25º36'long E
Suseni 46º40' lat. N 25º34'long E
Bacau 46º34' lat. N 26º55'long E
Onesti 46º15' lat. N 26º46'long E
Radeana 46º12' lat. N 26º56'long E
Oituz 46º13' lat. N 26º37'long E
Ploiesti 44º56' lat. N 26º02'long E
Gherghita 44º48' lat. N 26º16'long E
Tartasesti 44º34' lat. N 25º50'long E
Medgidia 44º15' lat. N 28º17'long E
Vulcanesti 45º41' lat. N 28º24'long E
   
 




PHOTO GALLERY